Victron Commissioning Webinar
A practical walkthrough of commissioning on/off-grid Victron systems, step by step.
This session will take installers through the full commissioning workflow for a Victron on-grid or off-grid system. We’ll cover the key configuration steps, recommended settings and the critical elements needed to ensure a clean, reliable setup.
What We’ll Cover
Core system setup:
- Programming MPPTs
- Configuring Inverter/Chargers (MultiPlus / Quattro)
- Integrating AC-coupled solar
- Setting up the Cerbo / Ekrano GX
- Adding and configuring a SmartShunt
- Working with managed batteries
Additional functionality:
- Introduction to Node-Red load shedding and basic automation options
Who This Is For
The session is designed for installers working on residential and industrial systems. It will not cover automotive-specific topics such as DC-DC chargers, although many principles will still be relevant.