Over 20 Platforms From 6 Key Suppliers

Each platform is supported by DPA and the equipment manufacturer during design, commissioning and operation.

  • DPA ESSential Series

    Modular 48V Commercial Battery Platform

    Factory-built, installer-ready battery cabinet systems designed for robust performance, serviceability, and harsh Australian environments.

    • 60–200kWh systems
    • 48V architecture
    • Fan forced cooling
    • Off-grid & C&I ready
    Learn More
  • Selectronic RiverGum & SP Pro

    120V Australian Stacking Battery System

    Proven Australian-built inverter-battery architecture for hybrid, generator supported, and remote commercial applications.

    • 44kWh to 1.4 MWh
    • 120V stack platform
    • AC-coupled specialist
    • Microgrid capable
    Learn More
  • PowerPlus Escape Series

    Scalable LV / HV Commercial Systems

    Modular commercial battery cabinets supporting hybrid systems, VPP pathways, and staged capacity growth.

    • 60–215kWh scalable to 4 MWh
    • LV or HV architecture
    • Designed for large-scale applications
    • VPP capable (where supported)
    Learn More
  • Deye GE and MS Series

    Integrated Inverter–Battery Architecture

    High-voltage commercial systems designed to simplify integration and reduce commissioning complexity.

    • BOS-G (40-60kWh)
    • GE-F60 (60kWh)
    • GE-F120-2H6 (120kWh)
    • MS-G215-2H3 (215kWh)
    • MS-GS215-2H3 (215kWh) integrated solar inputs.
    Learn More
  • Discover AES Cabinet Series

    Scalable HV Modular Platforms

    High-Voltage commercial systems, liquid cooled battery modules for extreme environments.

    • AES210HV (210kWh) scale to 5MWh
    • All In One266 (266kWh) scale to 5MWh*
    • CAB426 ( 426kWh) scale to 5 MWh*
    Learn More
  • Freedom Won MegaTower Range

    Large-Scale On/Off Grid-Support Systems

    Engineered commercial and utility-ready containerised energy storage platforms for high capacity deployments.

    • 442kWh – 1.7MWh, scale to 23MWh
    • Passive or fan cooled
    • FCAS & VPP participation
    • Utility-scale ready
    Learn More

Commercial Applications

  • Solar Self-Consumption

    Reduce grid reliance. Maximise solar consumption. Minimise grid use during peak tariff periods.

  • Peak Shaving & Load Shifting

    Reduce demand charges & keep maximum loads below network tariff limits.

  • Blackout Protection

    Maintain key operations during grid outages. Ride through grid frequency and voltage irregularities.

  • Diesel Off-Setting

    For off grid and grid connected sites that use generators, BESS equipment can reduce & optimise generator use.

  • FCAS Participation

    For grid connected projects, where large MWh batteries are required, FCAS income can be available through selected products.

  • Staged Capacity Expansion

    Deploy initial capacity with clear pathways for future growth as requirements evolve.

When To Engage DPA Energy

  • At the initial scoping phase.

    Understanding the end customer's high level goals. Site fundamentals: On grid, off grid and fringe of grid.

  • When documenting existing and future loads.

    Detailed mapping of the types of loads, motors with high starting current, load profiles & power factor. Record future expansion plans.

  • When planning validation and testing.

    Checking charge/discharge limits, temperature behaviour, ramp rates, or BMS–inverter communication during the design phase and testing during commissioning.

  • When planning for critical operation.

    Extra planning may be required if sites have critical loads with specific power requirements and complex operational profiles.

  • When planning for future expansion.

    When future loads, capacity increases, or system changes need to be planned into the architecture from day one.

  • How this will help your overall experience.

    We work alongside your team to remove blind spots early in the process, so systems behave as expected.

  • Early System Architecture Review

    Validating layout, topology, and control strategy before decisions are difficult to unwind.

  • Component Compatibility Checks

    Confirming batteries, inverters, chargers, monitoring, and site systems operate together as intended.

  • Manufacturer Coordination & Escalation

    Aligning vendors early and resolving technical questions before they surface on site.

  • Commissioning Support When It Matters

    Supporting systems under load when performance needs to be predictable.

  • Ongoing Support Beyond Handover

    Supporting validation, optimisation, and operational questions as systems evolve.

  • Documentation & Compliance Support

    Supporting SLDs, protection schedules, and approvals so projects move smoothly from design through commissioning.

Deliver Your Next Project with Confidence

Commercial energy storage projects demand early alignment and technical clarity. If you’re designing or quoting a C&I system, speak with our team before architecture is locked in.