DPA Cabinet Range

Low-voltage DC lithium cabinet systems engineered for large residential, agricultural, commercial and industrial applications. System integration design, cabinet assembly and full factory testing conducted in Victoria before delivery.

  • Deye Single Phase

    2 Bay Cabinet, Inverter & MPPT gear plates

    • 5,8,10,16kW Inverter options
    • Max batt capacity:50kWh
    • DC Bus terminal blocks
    • Fan forced cooling

    View Specifications
  • Deye Three Phase

    8 Bay Cabinet, Inverter & MPPT gear plates

    • 12, 24, 50, 100kW Inverter options
    • Max batt capacity:120kWh
    • DC Bus terminal blocks
    • Fan forced cooling
    View Specifications
  • Victron Single Phase

    2 Bay Cabinet, Inverter & MPPT gear plates

    • 5, 8, 10, 15, 20,kVa* Inverter options
    • Max batt capacity: 50 kWh
    • DC Bus terminal blocks
    • Fan forced cooling
    View Specifications
  • Victron Three Phase

    3 Bay Cabinet, Inverter & MPPT gear plates

    • 30,45,60 kVa* Inverter options
    • Max batt capacity:160kWh
    • DC Bus terminal blocks
    • Fan forced cooling
    View Specifications
  • Capacity Range

    50-120kWh per cabinet.

    Designed for off grid, on grid and fringe of grid sites.

  • Architecture

    Low-voltage lithium platform with integrated BMS. IP55 Steel cabinets. Various sizes

  • Thermal Management

    All models include fan-assisted cooling.

Integration & Deployment Considerations

  • Integration Considerations

    DPA cabinet systems require coordinated planning and configuration prior to deployment.

  • HV Inverter Pairing

    High-voltage inverter compatibility must be reviewed against system voltage range, charge parameters, and communication protocol.

  • Commissioning Planning

    Ensure a plan for commissioning has been prepared so all onsite loads can be operated in both normal and exception modes. Check generator syncing, pass through and battery charging. Testing should also include, remote monitoring, solar production and battery charging.

  • Protection & Compliance

    Site-level protection coordination, earthing strategy, and Australian Standards compliance must be verified before commissioning.

Evaluating cabinetised storage for your project?

DPA cabinet systems require detailed planning and system compatibility review before procurement. Speak with our Commercial Team to confirm suitability, configuration, and deployment pathway.